Updated: January 27, 2014 
Session Abstract:As systems drop their hard wired 'Twinax' devices, controlling interactive system use has become more and more a problem. With POWER7 system dropping twinax altogether, the only method to gain 5250 access to the system is via Telnet. And yet have even more power to run many applications on a single system image each with differing requirements for backups and maintenance. How can the users of these systems be controlled in a flexible manner that keeps them informed about the system state yet keeps them out of what is not currently available? |
Learning Objectives: |
Audience:IBM i System administrators with Interactive ('Green Screen') Users |
Level:This session is Intermediate to Advanced. |
Duration:75 Minutes |